https://ejurnal.unival-cilegon.ac.id/index.php/sisprotek/issue/feedSisprotek2024-09-04T12:15:41+00:00Open Journal Systems<p><strong>Sistem Poduksi Teknologi (Sisprotek) </strong>is a journal of Industrial Engineering Study Program at Al-Khairiyah University which contains research publications in the <strong>fields of Manufacturing Systems, Work Systems & Ergonomics, System Design & Industrial Management, Quantitative Modeling, Logistics & Supply Chain Management </strong>published by LPPM Al-Khairiyah University 2 times in 1 year or 1 time per semester. Published every July and December</p>https://ejurnal.unival-cilegon.ac.id/index.php/sisprotek/article/view/228ANALISIS TATA LETAK RUANG KANTOR DI DIVISI HR, GA&HSE MENGGUNAKAN METODE SPSS PT KRAKATAU JASA LOGISTIK 2024-07-29T05:56:51+00:00Dina Rosdianadina.unival@gmail.comRosa Vella Erdizondina.unival@gmail.comKhairul Anamdina.unival@gmail.com<p><span class="fontstyle0">Office layout is the organization of office space and the arrangement of office equipment and furniture on the available<br>floor area and office space to provide facilities for workers. An office is a place where employees do their work. A good<br>office layout can improve employee performance and generate greater profits for the company. The purpose of this<br>research is to get an overview of the office layout of the HR, GA & HSE division of PT Krakatau Jasa Logistik. This<br>research was conducted at PT Krakatau Jasa Logistik, which is located in building 1 of the PT Krakatau Engineering<br>office area at JL. Asia Raya, Kav. 0.3, Industrial Estate, Kotabumi, Purwakarta, Cilegon City, Banten, Indonesia. The<br>type of research used is descriptive quantitative research with a sample of 15 employees. The data collection methods<br>used are questionnaires and observations. This study uses the average (mean) and validity and reliability tests using the<br>SPSS 22.0 windows program. The results of this study indicate that the office layout in the HR, GA & HSE division of PT<br>Krakatau Jasa Logistik is very good from the room planning indicator has a frequency of 379 with a percentage of<br>25.89% and obtained an average value of 25.27 with a very good category, the equipment or furniture indicator has a<br>frequency of 337 with a percentage of 23.02% and obtained an average value of 22.47 with a very good category, the<br>spatial consideration / planning indicator has a frequency of 312 with a percentage of 21, 31% and obtained an average<br>value of 20.80 with a very good category, the lighting indicator had a frequency of 165 with a percentage of 11.27% and<br>obtained an average value of 11.00 with a good category, the indicator of messages conveyed graphically had a frequency<br>of 136 with a percentage of 9.29% and obtained an average value of 9.07 with a good category, and the last color<br>indicator had a frequency of 135 with a percentage of 9.22% and obtained an average value of 9.00 with a good category.<br>The validity test results show that all items are valid because r_count>r_Tabel. The reliability test results show a<br>Cronbach alpha value of 0.920, this means that this research is very reliable according to the predetermined provisions.<br></span><span class="fontstyle2">Keywords: </span><span class="fontstyle0">Office Layout, Spatial Considerations/Planning, Room Planning, Equipment or Furniture,<br>Lighting, Color, Graphically Conveyed MessagesOutput.</span> </p>2024-07-29T00:00:00+00:00Copyright (c) 2024 https://ejurnal.unival-cilegon.ac.id/index.php/sisprotek/article/view/232Analisis Potensi Bahaya Pada Pekerjaan Instalasi Pipa Cooling Tower2024-07-29T07:00:45+00:00Arief Bagus Arjunaarief_arjuna69@gmail.comRandy Giovani Prakarsaarief_arjuna69@gmail.comClarina Ayu Febriani arief_arjuna69@gmail.comMuhammad Ihsanarief_arjuna69@gmail.com<h1><em>A</em><em>bstract</em></h1> <p><em>Pipe installation work is work that has the potential for danger and a high level of risk which can cause minor work accidents and even death. Potential dangers in cooling tower pipe installation work include falling from a height, fire, slipping, being pinched, being hit, being crushed and electrocuted. Identifying potential hazards in each activity and controlling potential</em> <em>hazards is a step in cooling tower pipe installation work to prevent work accidents. Apart from that, every contractor who will carry out the work has the appropriate qualifications. The aim of this research is to identify potential hazards and control</em> <em>potential hazards in each cooling tower pipe installation work activity using the Job Safety Analysis (JSA) method. This research requires field observations and interviews with workers using analytical descriptive methods. Data from observations and interviews are collected and used to determine actions to control potential hazards to prevent work accidents. This cooling tower pipe installation work requires standard equipment which includes a mobile crane, scaffolding, welding machine, grinding machine, drilling machine, safety shoes, helmet, glasses, long-sleeved uniform, gloves, safety body harness, chemical gas mask. Labor competency for high-altitude work must have a certificate that complies with regulations and crane operators must have a valid Operator's License. A Work Permit must be drawn up to ensure the work is safe before work begins. The results of the potential hazard analysis are used to determine potential hazard control measures as a method for cooling tower pipe installation work at PT. Y in particular and other industries in general</em><em>.</em></p> <h4> <strong>Keywords</strong> : installation, pipes, analysis of potential hazard</h4>2024-07-29T00:00:00+00:00Copyright (c) 2024 https://ejurnal.unival-cilegon.ac.id/index.php/sisprotek/article/view/273OPTIMASI JADWAL PRODUKSI MENGGUNAKAN ALGORITMA GENETIKA PADA INDUSTRI SEMEN2024-08-07T21:44:14+00:00Puput Setianahpuputsetianah@gmail.comAzharipuputsetianah@gmail.com<p><em>The cement industry is one of the important industries in infrastructure development. Production schedule optimisation in the cement industry is very important to improve efficiency and productivity. Genetic algorithm (GA) is one of the optimisation methods that can be used to solve complex production scheduling problems. This research aims to optimise the production schedule in the cement industry using genetic algorithm. The genetic algorithm is implemented to produce a production schedule that minimises makespan (the completion time of all jobs) and maximises throughput (the number of products produced). Actual production data from the cement industry is used to evaluate the performance of the genetic algorithm. The results show that the genetic algorithm can generate a more optimal production schedule compared to the traditional method. Genetic algorithm can reduce makespan by 10% and increase throughput by 5%. This research shows that genetic algorithm is an effective method to optimise production schedule in cement industry. Genetic algorithm can help the cement industry to increase efficiency, productivity, and profit.</em></p> <p><em> </em></p> <p><strong><em>Keywords </em></strong><strong>: </strong><em>Schedule Optimisation, Cement Industry, Genetic Algorithm, Production Efficiency, Production Output.</em></p>2024-07-29T00:00:00+00:00Copyright (c) 2024 https://ejurnal.unival-cilegon.ac.id/index.php/sisprotek/article/view/231enilaian Risiko Ergonomi Dengan Metode ERADC (Ergonomic Risk Assessment Determinant Control) pada Pekerjaan Manual Handling2024-07-29T06:09:52+00:00Muhammad Zuhdizuhdi@unival.ac.id<p><span class="fontstyle0">bstract<br>This study focuses on the development of an ergonomic risk assessment method for manual handling work in<br>the labor-intensive industrial sector in Indonesia, with a case study at one of the painting company. Manual<br>handling work, which involves manual lifting of objects, remains an important aspect of the production<br>process, but carries the risk of injury and musculoskeletal disorders for workers. The ERADC ergonomic risk<br>assessment method is used to identify risk factors, such as heavy loads, incorrect posture, repetitive<br>movements, long work duration, work environment conditions, lack of assistive devices, lack of ergonomic<br>training, inappropriate work tools, time pressure, and lack of worker health monitoring. The results of the<br>risk assessment provide recommendations for risk control, including improving work environment<br>conditions, ergonomic training, and the use of appropriate assistive devices.<br></span><span class="fontstyle2">Keywords </span><span class="fontstyle3">: </span><span class="fontstyle2">Manual handling work, Ergonomic Risk, ERADC Method</span></p>2024-07-29T00:00:00+00:00Copyright (c) 2024 https://ejurnal.unival-cilegon.ac.id/index.php/sisprotek/article/view/275ANALISIS KINERJA MESIN CNC WIRE CUTFANUC ROBOCUTα C400iB DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) PADA PT. XYZ2024-08-07T22:29:59+00:00Juju Adhiwikartajujuadhiwikarta@gmail.com<p><em>PT.XYZ is a company engaged in manufacturing, focusing on the manufacture of molds and molds. In addition to mold and mildew manufacturing, the company also manufactures support machines in increasing production at other companies in the same group. With the increasing demand in the manufacture of molds, molds, and supporting machines, it turns out that the performance of the Fanuc Robocut -c400ib CNC Wire Cut machine is still less efficient with increasing demand, so companies have to find new ones. methods to improve engine performance, one of which is the implementation of Overall Equipment Effectiveness (OEE) which can be used to help calculate engine efficiency. In calculations,the OEE measures availability, performance, and quality. After making a study on the machine, it turned out that the CNC Wire Cut Fanuc Robocut -c400ib machine experienced high downtime, it was feared that it could slow down the production process where product demand from customers could not be completed according to the agreement. On the Fanuc Robocut -c400ib CNC Wire Cut machine the OEE value before research in December 2019 was 53.63%. Therefore, the authors focus on providing suggestions for improvements on the machine. The analysis used 4M1E, then the cause of the problem was searched with fish bones. The increase in OEE value is expected to increase the efficiency of machines that have high downtime.</em></p> <p><em> </em></p> <p> </p> <p><br><strong>Keyword </strong>: <em>Dies, Mould, </em>CNC <em>Wire CutFanuc Robocut α-c400ib machine</em>, <em>downtime, </em>OEE, 4M1E, <em>fishbone</em>.</p>2024-07-29T00:00:00+00:00Copyright (c) 2024 https://ejurnal.unival-cilegon.ac.id/index.php/sisprotek/article/view/288PERANCANGAN SISTEM PENGELOLAAN SAMPAH RUMAH TANGGA DENGAN PENDEKATAN SISTEM DINAMIS DI DESA BANJARAGUNG2024-09-04T12:15:41+00:00Fajar Hayyinfajar.hayyin@gmail.com<p><strong><em>Abstract</em></strong></p> <p><em>Household waste management is an urgent environmental issue, especially in urban areas in Indonesia which are experiencing a significant increase in waste volume. This study aims to develop a more adaptive and efficient waste management system using a dynamic systems approach, with a focus on Banjaragung Village. This research identifies the main challenges in waste management, such as transportation delays and limited organic waste processing capacity. Data was obtained through household surveys, field observations, and interviews with stakeholders. Dynamic models are used to simulate various management scenarios, including increasing transport frequency, processing capacity, and community participation in recycling. The simulation results show a reduction in waste accumulation of up to 30%, meaning that optimization in waste transportation and processing as well as increasing community participation can reduce waste volume and increase operational efficiency. In addition, implementing environmental policies such as a ban on the use of single-use plastic also has significant potential in reducing the burden of waste management. These findings offer insights for policy makers and waste managers in designing more sustainable management strategies.</em></p> <p><em> </em></p> <p><strong><em>Keywords </em></strong><strong>:</strong> <em>Dynamic Systems, Waste Management, Household, Efficiency, Environment</em><em>.</em></p> <p><strong><em> </em></strong></p>2024-07-29T00:00:00+00:00Copyright (c) 2024